Column Steel Quantity & Costing

šŸ—ļø Civil BBS & Costing

Compute vertical RCC column reinforcement weights, 50d lapping allowances, diameter-wise tonnage, and complete procurement costing (Steel + 18% GST + GST-Exempt Electricity).

1 Input Parameters

Active Entry
mm
nos
nos
m
₹/Ton
%
₹/Ton
Lap Length per Bar: 0.80 m (50d) | Total Lapping Length (6 Bars): 4.80 m

2 Live Item Preview (C1)

Live Preview (Before Adding)
ID Dia Qty Cutting Len Wt/Bar Lapp/Bar Wt/Col Lapp/Col Total Col Total Lapp Wt Total Col Wt Steel Cost GST (18%) Electricity Total Cost

3 Added Rebar List & Summary Saved Items (1)

ID Dia Qty Cutting Len Wt/Bar Lapp/Bar Wt/Col Lapp/Col Total Col Total Lapp Wt Total Col Wt Steel Cost GST (18%) Electricity Total Cost Action

Rebar Consumption by Diameter

Total Items: 0
Total Lapp Wt: 0.00 kg
Total Rebar Wt: 0.00 kg (0.000 Ton)
Subtotal: ₹0
Tax/GST: ₹0
Elec/Labor: ₹0
Final Payable: ₹0

Engineering & Costing Formulas Used

Unit Weight (kg/m): (Dia Ɨ Dia) / 162
Weight/Bar (kg): Cutting Length (m) Ɨ Unit Weight
Lapp/Bar (kg): ((Lap Factor Ɨ Dia) / 1000) Ɨ Unit Weight
Total Column Wt (kg): (Wt/Col + Lapp/Col) Ɨ No. of Columns
Total Tonnage (Ton): Total Column Weight (kg) / 1000
Steel Cost: Total Weight (Ton) Ɨ Steel Rate (/Ton)
GST (18%): Steel Cost Ɨ 0.18
Electricity (0% GST Exempt): Total Weight (Ton) Ɨ Electricity Rate (/Ton)